Categories
GM 127 with PORUS X
Interior finishing plaster with PORUS X

Plaster coat is applied by stainless steel trowel in thin layers on the substrate. When applied in multiple layers, the drying time between layers is at least 6 hours.
SHARE
Calculate consumption
Technical Documentation
Lucrări de REFERINȚĂ
Best OFFER
Do you need the best quality building materials? You arrived in the right place.
ADEPLAST
The most important Romanian manufacturer of building materials with four industrial platforms, Adeplast is the leader in the country, with multiple recognitions throughout Europe.




